Several major factors related to data center cabling success
Wiring for data centers, as the body's blood vessels, its importance is self-evident. But the data center cabling wrongly equated with simple wire connection, such misunderstandings are common. As the data center in the operation of the company in the increasingly important position, the wiring of the responsibility not only confined to this, but assume the room information highway and bridge load, security information flow smooth operator. Therefore, computer management personnel in the wiring rack one's brains, to design a set of both information flow, and simple wiring schemes. Vascular congestion will lead to health of people with stroke, similarly, data center "healthy " and wiring are closely related.
With the continuous improvement of living standards, the majority of people more and more attention to physical health, no longer ignore minor ailments exist. Similarly, the wiring in addition to ensuring data center of the basic operation, the corners of the same can not be ignored. An efficient data center is absolutely not allowed not to commit, minor illness constantly. "Sub-health" state.
Data center "inferior healthy" wiring factors
In the wiring process, the most headache is messy lines. Perplexing line will not only in a visually stunning, it will cause inefficiency. Just imagine when the data center of a node failure, had to spend several hours to cable strand out to find the problem, if not sorted out into greater error, the loss outweighs the gain. It really is. These problems should be in a data center at the beginning of construction should be considered, and the design of a comprehensive wiring scheme, if not, it may lead to adverse consequences.
Likewise, few people consider the strength of electrical separation problems. Strong relative to weak concept, mainly used for power and lighting. The weak main processing signal transmission, exchange information. Over a very large number of household wiring, we can often see construction of the electricity and tied together, which acts on the signal of smaller family had little effect, but the data information is extremely dense data center, absolutely not! Because of strong magnetic field around, the weak interference, and weak system is the key component of the data center, carrying a large amount of data transmission. So the strength of electrical wire slot must be separate. The distance to the different standards, generally at least 300 mm above.
In routing process, also will produce the others problems, lead to net brings physical injury, but it has its own quality and reticle are closely related. For example, in the connection process, if the action is too unfeeling ", sometimes lead to cable skin damage, even to the inside of the line is exposed to the outside, or because the method is undeserved, cause crystal loosening or shedding, will affect the network transmission of data quality.
Cure data center "inferior healthy" wiring treatment prescription
Prior to 1985, wiring standard has not yet become users are concerned about, with the development of computer technology and computer system diversification, for wiring standard voice more strongly, so the electronic industries association and the telecommunications industry association began to develop commercial building telecommunications cabling standard, namely the famous ANSl / EIA / TIA-568.
For the data center, the most commonly used standard has two kinds: one kind is ANSl / EIA / TIA-568-B, called category six cabling standards; the other is a European ISO / IEC 11801 both have some differences. But recently, two standard already more and more close, regardless of which one, never appeared in another standard work results.
Category six cabling standard presented significant, description of category six cabling products are mature, can be put into use before five, ultra five cable has been unable to adapt to today's Gigabit Ethernet transmission, the so-called super category six cable, as when the fry raise a Babel of criticism of MP4, there is still not a standard concept, seven cable is shielded twisted pair, due to the higher cost so much.
The data center "inferior healthy"
As we said, cabling in data center, equivalent to the blood vessels in the body. For health, people will go to consult a health professional, learning a way of keeping good health. And the integrated wiring system, matter to a data center operation success or failure.
To sum up, the comprehensive wiring system is a set of specially designed for modern intelligent building wiring system, according to certain criteria (such as the United States ANSl / EIA / TIA-568-B standard), using high quality materials, in a modular way construction in each node connected together to form a complete set of system.
Integrated wiring for data center provides a sound ecosystem. Although it is not the server, database, data center necessary hardware and software development is rapid, and not a moment of good writings make people copy them. Cloud computing, but as the underlying basis management part, never ceases to steer the pace. If a data center by wiring is not perfect, causes an interrupt, then began to attach importance to data center "health", whether it is business loss, or follow the" treatment ", will pay a heavy price.